The 2600 ton anti-corrosion pile and pipe project in South America is used for port and wharf construction in South America island countries, and the anti-corrosion brand is Carboline 300M, no winter type paint, but the international brand paint Carboline has a clear requirement for the construction and production environment, which should not be lower than 10 degrees. As the temperature in Tianjin gradually turns cold from October to only a few degrees in November, it is a great challenge for Xinyue. It is like a thunderbolt on a sunny day, but Xinyue people have the spirit of never flinching back, they can only use their collective wisdom to do it To solve the difficulties, finish the goods on time and quality. Xinyue would like to thank every hardworking worker, supervisor of the whole process supervision,Xinyue guys and customers in the whole process. Without their daily overtime to the early morning, there would be no such batch of piles with perfect delivery.

To live up to the task and have a long way to go

According to the original contract plan, November bulk carriers are scheduled. However, due to the outbreak of global epidemic, the original scheduled bulk carrier changes its sailing schedule and does not leave for Tianjin port. In order to meet the urgent demand of the project site, Xinyue exchanges high prices for other cargo ships, so as to catch up with the customer's delivery schedule. However, affected by the epidemic again, the crew on the cargo ship went on strike. In addition to the new cases in China, many ports refused to exchange crew members. Fortunately, after changing crew members, everything began to go smoothly. According to the actual situation, Tianjin Port was heavily under pressure, and many bulk carriers were waiting at the anchorage for 10 days and a half months, which was normal. Due to the customer's urgent project, Tianjin Xinyue's Logistics Department Actively communicate and cooperate with forwarders and shipowners for many times, and must berth and load immediately.


Tianjin Xinyue has rich experience in operation of project list. We believe that the team is not afraid of difficulties, perfect to overcome every link of the problem. From the third party, it is required to conduct 100% ut test at the weld of each steel pipe, and it is required to wait 24 hours for cooling before ut test. Every link is carried out in strict accordance with ITP, from steel pipe production to anti-corrosion, shipping and port loading, the third party is in the whole process, and customers are involved in the whole process.


Xinyue actively cooperates with the third party to inspect every production link. Although it is hard in the process, it has been recognized by professional TUV inspectors and satisfied by customers. Everything is worth it,

To live up to the task and have a long way to go

At the same time, Tianjin Xinyue technical team and document team actively cooperated with customers to make project documents, and completed the most comprehensive pile pipe project documents in Xinyue's history, with more than 2000 pages of project documents.

At the beginning of February, the customer flew to Xinyue Changsha branch to make a project summary, and the customer put forward many valuable opinions. At the same time, through this cooperation, Xinyue and the customer have established a deeper understanding and cooperation. I believe that through this project operation, it has done a strong foundation for the follow-up new projects.


Xinyue people sincerely look forward to working with you!