Positive feedback from steel rail customer
Jan. 05, 2021
At beginning of march 3rd 2019, Xinyue Steel Group received positive feedback from our Myanmar client: Our in-time arrival of all 445 tons hot rolled steel rails ensure the success progress of this project.
Based on the trust & support accumulated from the first order, this time our client sent their MTO & contract draft for the steel pipes & fittings item of this same project without any hesitate. To show their sincerity to cooperate with us for a long term, client has sent us their contract draft at the same time.
Xinyue Steel Group values every client, focus on every item & every details to offer the best service to our clients, build the most superior brand of “XINYUE”.
Written by Nicole