Pakistan Coal Power Plant Water Supply Project
May. 13, 2019
Xinyue Steel Group welcomed two Pakistan Clients this week. Their company is constructing two coal-fired power plants and plan to lay two pipelines for water supply. The main purpose of this visit is to come to our factory to inspect the production equipment, production capacity and steel pipe quality, so as to ensure the Purchasing quality and construction progress of the project.
First of all, we arranged a meeting and had detailed business talks with customers. During this meeting, the clients raised questions and asked about the production capacity of the ordered steel pipe, the internal and external coating requirements and how to ensure the outer diameter of the pipe end during transportation. In response to the technical difficulties and quality questions raised by clients, our production manager yang, marketing manager Aissa and salesman tony gave clear answers to clients.
After meeting, we led Pakistani clients to visit the production line of the factory. Clients mainly inspected three production lines, weld quality and radiographic testing inspection room. Through the inspection of the production capacity, welding level and RT inspection level, the customers have fully affirmed our factory.
Summing up this visit, Clients are very satisfied with our factory inspection. We still need to make great efforts in the following commercial and trade negotiations. Looking forward to the next visit of Pakistani customers.
Xinyue Steel build the world, serve the globe! Welcome to contact us and looking forward future cooperation !
Written by Tony