Tianjin Xinyue Industrial and Trade Co., Ltd.
Tianjin Xinyue Industrial and Trade Co., Ltd.
Home > News

LSAW FAQ

Jul. 11, 2018

Q1: What's the main application of LSAW steel pipe?

A1: LSAW is widely used in low-pressure liquid transmission, steel structure, power plant construction.

Q2: What's Xinyue's Product Range for LSAW?

A2: Xinyue's Product Range for LSAW steel pipe as below:

OD: 355.6mm to 1626mm (1016mm steel pipe)

WT: 8mm-50mm

Length: Up to 12m.

Q3: What kind of surface treatment can you offer?

A3: We can offer coal tar epoxy, FBE, 2PE, 3LPE, 3PP, Hot-dipped galvanized, Polyamide Epoxy, zinc coating, bitumen, varnish coating, and etc.

Q4: What's the MOQ for LSAW steel pipe?

A4: MOQ for LSAW steel pipe is 1 ton.

Q5: Do you provide other steel pipes?

A5: Xinyue's main products include ERW, LSAW, SSAW, SMLS, Scaffolding, Couplers and pipe fitting. And we provide carbon steel, alloy steel, and stainless steel products.

Q6: What is your main market for LSAW steel pipe?

A6:Main market for LSAW steel pipe includes Middle East, South Africa, Southeast Asia, Australian and Latin America.

Q7: Is it OK to print customer’s logo on steel pipe product?

A7: Yes. please inform us formally before our production and confirm the design.

Q8: How long is your delivery time?

A8: Generally it is 10-15 days for the stock products. And 20-30 days if the goods are not in stock, according to quantity requirement. And sooner if you can accept partial department.

Q9: Whats your payment term?

A9: We accepy 30% deposit, 70% balance against the copy of B/L, T/T or LC at sight, etc.

Q10: What’s the main standard and steel grade for LSAW?

A10: Main standard and steel grade for LSAW includes API 5L, API 2B, ASTM A53, EN10217, EN10219, ASTM A500, ASTM A252, ASTM A672, DIN 2458, IS 3589, etc.

Q11: What’s the main technique for LSAW?

Q12: JCOE.

Q12: What’s the main application for LSAW steel pipe?

A12: Xinyue LSAW steel pipe is widely applied in oil, natural gas, steel structure, power plant, ship manufacturing, foundation, and piling projects, etc.

Q13: How much production line do your mill have?

A13: Our mill has equipped with 3 JCOE double submerged-arc longitudinal welded production line and several roller welding production line, with a team of 328 workers, 58 senior engineers and technicians. Annual production capacity can reach 300,000 tons..

Q14: What’s Xinyue’s facility equipment for LSAW production base?

A14: The LSAW production line has introduced with supreme quality-guarantee technique--JCOE. The roller welding line can produce straight seam rolled pipe from OD 355.6mm to 3800mm, wall thickness from 8mm to 120mm.

Q15: How will you control your product quality?

A15: We have developed perfect processing and inspecting instruction and controlled in details from raw material purchasing and inspection, pipe forming, online inspection, finished pipe testing, anti-corrosion coating, marking, packing, storage, shipment until to after-sale service.


Previous: SMLS FAQ
Next: ERW FAQ

Hot Products

CONTACT US
Request a Quote